1. Exploration stage:
Geological survey: Use seismic exploration equipment to obtain underground geological information and determine favorable natural gas accumulation areas.
Drilling wells: Use drilling rigs to drill wells, obtain samples such as formation cores and cuttings, and analyze the gas content of the formation.
2. Development stage:
Drilling: Use drilling rigs to drill production wells, injection wells, etc. to establish channels for natural gas extraction.
Completion: Lower casing, cementing, perforation, etc. to establish a channel for natural gas to flow from the formation to the wellbore.
Gas testing: Test natural gas production, pressure and other parameters to evaluate the development value of gas reservoirs.
3. Production stage:
Gas production: Use equipment such as gas production trees and separators to extract natural gas from the bottom of the well and perform preliminary processing.
Gathering and transportation: Use pipelines, compressors and other equipment to transport natural gas to processing plants or users.
As natural gas exploration and development advances into deep layers, deep seas, and unconventional areas, drilling equipment is also constantly being updated, mainly in the following aspects:
Automation and intelligence: The application of technologies such as automated drilling systems and intelligent drill bits has improved drilling efficiency and safety.
High efficiency and energy saving: The application of new drilling fluids, high-efficiency drill bits and other technologies has reduced drilling costs.
Environmental protection and safety: The application of new well control equipment, environmentally friendly drilling fluids and other technologies has reduced pollution to the environment.
Product advantages
High-quality materials: All products are made of high-grade alloy steel, which has high strength and corrosion resistance and is suitable for extreme working environments.
Customized services: Provide tailor-made solutions based on the specific needs of customers, covering all aspects from preliminary design to final implementation.
Technical support: The company has an experienced technical team that can provide timely and effective support during project execution and solve various problems encountered on site.
Specific results
Improved mining efficiency: Compared with traditional methods, new drilling technologies and equipment have significantly shortened project cycles.
Reduced costs: Due to the superior performance of the equipment, maintenance frequency and downtime are reduced, thereby reducing overall operating costs.
Enhanced safety: The high-quality casing system effectively prevents the risk of well wall collapse and ensures the safety of personnel and equipment.
Previous:
Engineering Case
Copyright © Jinzhou City TongShun Drilling Machine Co.,Ltd. All Rights Reserved Sitemap | Powered by